RSS Feeds for Starting E-House manufacture for Te Giac Trang Mine H5 rig project | Tạp chí Năng lượng Việt Nam May 07, 2024 21:43
Vietnam Energy Forum

Starting E-House manufacture for Te Giac Trang Mine H5 rig project

 - At the PVC- MMS port, Petroleum Machinary Assembly & Metal Structure JSC (PVC-MS, stock code: PXS) held a beginning ceremony of E-House manufacture for Te Giac Trang Mine (White Rhinoceros) H5 rig Project.

E-House is considered a brain of exploiting rig, and a part that integrates the whole automatic control systems, modern equipment with the most advanced technology quality. The design, manufacture and installation of these systems require very highly a standard, ability and experience of implementation.

Market share of E-House manufacture in Vietnam is very potential because for a long time, petroleum contractors had to import monolithic E-House from abroad. PVC-MS is a Vietnamese Construction and Installation Unit which has experiences through successful implementation of the E-Houses of the South & North Su Tu Nau (Brown Lion) and North-East Su Tu Vang (Golden Lion) projects for Cuu Long JOC Investor, E-House of the Diamond project and is developing an E-House of Thai Binh project for Việt Nam Petronas Carigali Investor.

Honeywell is a main EPC contractor in the implementation of the whole E-House. This is one of the biggest enterprise in the world on the energy technology solutions with the development history of over 125 years, 132,000 employees worldwide.

With the ability and experience through the carried out projects, along with the successful implementation of the E-House of H1, H4 rig projects in the past, Honeywell has been entrusted to implement the next package E-House of of H5 rig project and introduce a consortium of contractors McPEC/PVC-MS for designing, purchasing and manufacturing at the PVC-MS port.

This event opens a new step of PVC-MS in localization of working parts with the high technology level and coming step by step to assume 100% of the items of the E-House.

According to the plan, on March 9th, 2015, PVC-MS will  complete and hand over E-House of H5 Project for Investor

Vietnamenergy.vn

News

Posted news

[More view]