Vietnam Energy Online - Search results for keyword "White%20Lion%20mine". Hope you find the content you want on https://vietnamenergy.vn/
New petroleum discovery at East White Cat well – 1X
08:22 | 13/08/2018
On August 9, 2018, PetroVietnam informed that Vietsovpetro has discovered a new petroleum well – Meo Trang Dong (East White Cat) – 1X (Lot 09-1,VSP). After this discovery, the relevant units will carry out the assessment of reserves and prepare the plan for putting the project into operation.
Welcome ceremony for the first oil flow from the white rhino field
21:01 | 06/11/2015
At October 30 evening, in Ho Chi Minh city, PetroVietnam held a welcome ceremony for the first oil flow from the drilling rig H5 of the white rhino field managed by Hoang Long Company in join-venture with partners from Vietnam, US and Thailand. Vice Prime Minister Hoang Trung Hai attended and spoke at the ceremony.
The first oil flow from White Rabbit 3 drilling rig
07:54 | 09/05/2017
At 7.00 am on May 7, at 37 P well of the White Rabbit field, the White Rabbit 3 drilling rig officially exploited the first oil flow (for 13 days earlier than planned) with an initial production of 164 tons per day.
Admitting the first oil flow from White Rabbit Field 03
10:06 | 04/03/2017
On March 01, 2017 at the Well 37P of the White Rabbit Field, Tam Dao 05 Drilling Rig gave the first oil flow.
Putting the drilling rig ThTC-02 at the White Rabbit field into operation
07:57 | 11/12/2015
On December 7, 2015 Vietnam - Russia Joint Venture Corporation (Vietsovpetro) held a ceremony for pinning the project board, summarizing emulation of building works and putting the drilling rig ThTC-02 at the White Rabbit field into operation.
Starting manufacturing ST PIP compressor for the White Lion mine
08:36 | 03/02/2015
On January 29th, 2015, at the PetroVietnam Technical and Service Corporation (PTSC) Lower section Port in Vung Tau city, PTSC M&C was held a Groundbreaking Ceremony of manufacturing ST PIP compressor for the White Lion mine.
Successful launching the base of BK-21 wellhead rig at White Tiger field
08:28 | 15/05/2020
On 13/5/2020, at the manufacturing site, the Enterprise for Constructing, Surveying and Repairing Petroleum Exploitation Projects (Construction Enterprise) has successfully launched the base of BK-21 uninhabited wellhead rig for White Tiger field to VSP-05 barge.
Receiving the first commercial oil stream by BK-20 rig from White Tiger field
09:10 | 07/11/2019
At 20:00 on October 26, 2019, the Vietnam-Russia Petroleum Joint Venture (Vietsovpetro) received the first commercial oil stream with a beginning flow of 288 tons per day by BK-20 rig from MTD-2X well at White Tiger field.