RSS

The first oil flow from White Rabbit 3 drilling rig

07:54 |09/05/2017

At 7.00 am on May 7, at 37 P well of the White Rabbit field, the White Rabbit 3 drilling rig officially exploited the first oil flow (for 13 days earlier than planned) with an ...

Admitting the first oil flow from White Rabbit Field 03

10:06 |04/03/2017

On March 01, 2017 at the Well 37P of the White Rabbit Field, Tam Dao 05 Drilling Rig gave the first oil flow.

Launching the under-frame of Tho Trang rig 3

09:35 |26/08/2016

On August 22, 2016, at the Vietnam-Russia Joint Venture Port, Petroleum Equipment Assembly and Metal Structural JSC (PVC-MS, stocks code: PXS) has successfully launched the under-frame of Tho Trang (White Rabbit) rig 3 invested by ...

Putting the drilling rig ThTC-02 at the White Rabbit field into operation

07:57 |11/12/2015

On December 7, 2015 Vietnam - Russia Joint Venture Corporation (Vietsovpetro) held a ceremony for pinning the project board, summarizing emulation of building works and putting the drilling rig ThTC-02 at the White Rabbit field ...