RSS Feeds for Kết quả tìm kiếm từ khóa: 19.2MW | Trang 1 April 20, 2024 16:41
Vietnam Energy Forum
groundbreaking a 192mw solar power project in quang ngai province

Groundbreaking a 19.2MW Solar Power Project in Quang Ngai province

On October 29 morning, in Duc Minh commune (Mo Duc District), Quang Ngai Provincial People’s Committee (PPC) and the Investor held a groundbreaking ceremony for the Thien Tan Solar Power Project SPP. Deputy Prime Minister Hoang Trung Hai attended and spoke at the ceremony.
2mw solis solar pv system unlocks over 80000 annual electricity costs savings

2MW Solis solar PV system unlocks over £80,000 annual electricity costs savings

Ningbo, China-Ginlong Technologies Co.,Ltd. (Solis) (Stock Code: 300763.SZ), a global leader in photovoltaicstring inverter manufacturing has worked alongside UK renewable energy company Engenera to install a rooftop solar power system for plastics manufacturer, Faerch Plast.  At 2MW, utilizing Solis 110kW inverters and with over 4000 modules this is a substantial large scale rooftop installation.
ge renewable energy strengthens its position in south central vietnam with another 272mw project

GE Renewable Energy strengthens its position in South Central Vietnam with another 27.2MW project

On December 28, GE Renewable Energy announced that it has secured a 27.2 MW contract to supply 8 units of GE’s 3MW-137 wind turbines to support construction of the Phuoc Minh Wind Farm, located in Ninh Thuan, in the South Central Region of Vietnam. A consortium of PowerChina Huadong Engineering Corporation, Henste Engineering and IPC Group will provide full Engineering, Procurement and Construction services for the project.
for the first time the reserve offset factor of pvn has reached 119 times since 2016

For the first time, the 'reserve offset' factor of PVN has reached 1.19 times since 2016

Information from the Vietnam Oil and Gas Group (PVN) said: With the drastic implementation of "The package of solutions to cope with the double impact of the Covid-19 pandemic and deeply falling oil prices", in recent 6 months, PVN all activities were ensured safely and for the first time since 2016 the 'reserve offset' factor (between increasing reserves and production) reached 1.19 times - safety level for sustainable development.