RSS

Launching the under-frame of Tho Trang rig 3

Launching the under-frame of Tho Trang rig 3 - 

On August 22, 2016, at the Vietnam-Russia Joint Venture Port, Petroleum Equipment Assembly and Metal Structural JSC (PVC-MS, stocks code: PXS) has successfully launched the under-frame of Tho Trang (White Rabbit) rig 3 invested by Vietnam-Russia joint venture, and implemented by PVC-MS as a Contractor for manufacture and assembly.

The total weight of the seat of Tho Trang rig 3 is 1,000 tons of the under-frame and 950 tons of the piles.

After 80 days for absolute safe manufacture and assembly, PVC-MS has completed the under-frame of Tho Trang rig 3 with ensuring quality, progress and efficiency. The under-frame has been launched and handed over to the investor for offshore installation.

At the same time, PVC-MS is focusing to construct Topside of Su tu Trang (White Lion) rig which expects to be completed with onshore manufacture and handed over to the Vietnam-Russia Joint Venture in Feb. 2017.

Previously, on August 18,2016, PVC-MS already successfully launched the under-frame of the house rig at Su Tu Trang field.

Su Tu Trang under-frame is a part of the Su Tu Trang development project phase 1 of Cuu Long JOC with PVC-MS as EPC contractor.

The total weight of Su Tu Trang under-frame is over 2000 tons including piles and auxiliary structures. Today, after 12 months of executing the work, PVC-MS has completed the under-frame of Su Tu Trang house rig and relating works, and handed over it to the general contractor for offshore installation on August 23.

VietnamEnergy.vn

Leave your comment on this story